Friday, January 3, 2014

Painting & Electric - Day 115

After a few lengthy and somewhat heated discussions about painting and paint type with our painter this morning, I think we have everything ready to go for paint on the doors and walls today!

The electricians are coming back to work today and hopefully things will be moving along!

Update: The paint guy "stood by his word" and made things right after a rough start this morning. I don't feel comfortable posting details, but suffice it to say it looks amazing. 
Fireplace wall: Glidden dusty Miller (matched by Sherwin Williams)
TV Wall: sherwin Williams Perfect Greige
Dusty Miller and Maple Valley Chiffon cabinets. The paint here looks different than it does in real life. 
Perfect greige
Perfect greige
Perfect greige
Sunroom: Dusty Miller
Our Great Room / sunroom colors 
from the dining room with minimal light

The painters will be working today and said they still need to come back Monday. We are supposed to get 8-12 inches of snow Sunday and have crazy temperatures, so hopefully we don't get too backed up. Hard floors are supposed to be installed next week. 

The electricians must not be coming back until next week. 

Things are looking good. :) 

Thursday, January 2, 2014

Traffic Jam and Snow Storms - Day 114

The electricians showed up bright and early to start the final electric only to discover...... Painting wasn't finished!

As we were talking, the painter called the electrician and told him not to finish or hang anything because they weren't don't painting yet. 

After our electrician got off of the phone, he said it looked like he will have to reschedule yet again for next week (3rd time now) to do final electric BUT they would work on the basement and possibly the exterior lights today. He said it was our project manager's fault, but I told him about the painters... Oh well. It is what it is.

The stone mason came back to fix the fireplace hearth that came apart. I don't think I mentioned that before. 

The painters are supposed to be here today to do the trim.  

Progress. 

Update: today, our fireplace hearth was fixed and the grout was cleaned up, our propane tank was picked up, some of our electric was finished in the basement, a few fixtures installed on the outside, and the trim was painted antique white. We really like the color of the trim! 

The painter will be back tomorrow to do walls and at least prime doors if not bust out our paint for them. They would like to be done by Saturday. 

We Can't wait for this to all come together! Hard floors next week, carpet the following, and then it's move time! 




Wednesday, January 1, 2014

Nothing - Day 113

We wouldn't have expected anyone to be here today if they didn't promise it. Twice.

We made a list of all of the things that need fixed today and it is growing. 


Tuesday, December 31, 2013

Excavators and No Painters...again. - Day 112

The excavators are here laying the rest of our downspout / curtain drains. They underestimated the amount of pipe they needed by a lot, so we are were not anticipating our bill... However he worked with us to make it right. Good business. They fixed the leaky spot in the basement where they put our lines in with hydraulic cement so hopefully that won't be an issue again!

Painters didn't show up again. Son had to go to the hospital. 


Monday, December 30, 2013

Excavators & No Painters Day 111

Our excavators came and laid downspouts / tile around the perimeter of our house all the way to the creek. Our boys had fun watching them work!

A drywall guy came and fixed the cracks in all of the sunroom seams and peaks. He said our field manager was going to fix the one in the great room by the foyer. It requires scaffolding. 

Painters didn't show up today. We were mad at first but what's another day at this point? 

Friday, December 27, 2013

Painters, Heat Pump, & Applicances - Day 108

The painters worked all day today sanding the nail holes our carpenter crew created. We weren't impressed with the carpenters attention to detail or with the amount of nail holes they created, and neither were the painters. They said our house was one of the worst they had seen and it caused them a lot of extra time & effort. Our little guys made them some cookies and drew them a card since they were home playing with their Christmas goodies.

We talked with our site foreman and our new anticipated date to close is January 17th. We knew this was coming.
Monday, 12/30 - Painters will be painting trim. Foreman will be stopping by to make sure things are running smoothly.

  • Tuesday, 12/31 - Painters are painting walls
  • Wednesdsay 1/1 - Happy 2014!
  • Thursday 1/2 - ?
  • Friday 1/3 - Electricians will be here working on final electric
  • Tuesday 1/7 - Hard Floors
  • Wednesday 1/8 - Hard Floors
  • Thursday 1/9 - Plumbers
  • Friday 1/10 - Plumbers
  • Monday 1/13 - Carpet
  • Tuesday 1/14 - Carpet
  • Friday 1/17 - Tentative Closing

Monday, December 23, 2013

Correct Shakes and Gutters - Day 104

The siding crew came back today and installed the correct shake siding color, as well as the gutters. They also removed the wrong color shakes.
 It looks great! We did notice, however, they ran out of siding and covered our dormer with the shakes instead. 
The framers also forgot to remove the stickers from the interior of the dormer, so they will have to come back and remove those as well. The stickers are on the INSIDE!
The missing column on the left is supposed to be here & installed next week. 

Sunday, December 22, 2013

Friday, December 20, 2013

Beautiful - Day 101

Loving the look of our columns!
These color shakes are starting to grow own me as a contrast with the roof color. We originally picked a brown. We are loving the look from the driveway!

Our sweet columns. Neither of us thought they would be this big, but they are awesome. They did, however, forget to order the one on the far left that you can't see. Ooops. ;)
 

Lightrail installed! We were worried our cabinets were going to be too plain, but we absolutely love them. They are Spring Valley Maple Chiffon and we went ahead and upgraded to dovetail / slow close drawers. We also have fancy pull outs in our base cabinets. We didn't even ask for them.... they came standard with this type of cabinet. Fancy!

Over the commode shelf in kids' bathroom - This was a splurge and we're not sure it was worth it, but we like it and it will be really nice when our boys grow up.
 
They still need to install both medicine cabinets. Those were also not included, but weren't very expensive either.
 
 

Fireplace and mantel before stone. Good job hubby! I will be so happy he can put this behind him and be able to sleep at night. We are thanking our lucky stars our fireplace drama is over. WE WISH we would have just put in a WH woodburning fireplace (a cheap unit) and then put our insert in... it would have probably cost the same amount and saved everyone a lot of headache. We thought doing our own insert (Purchased from Kerns Fireplace in Lima, Ohio) would save us some time, money and headache but we were wrong. The good thing? It's going to be worth it!






A long day for the carpenters! - Day 100

No pictures today, but the carpenters worked until about 10:45 or 11:00 pm today! We actually went to bed before they left. Our eight-year-old had a politeness meal for scouts, so he took them out some Christmas cookies and had a quick chat. This makes us super happy because he is normally so shy, but the different crews being here have helped him branch out. Most all of them were very nice and down to earth! :)

Lots of progress was made today... Lots of small mistakes too. All of the trim, jamb, case, doors, cabinets, granite kitchen sink, counters, and wood 1/2 capped walls are done. 2/3 of the beautiful craftsman columns are installed. It looks like a home and it is very evident that a lot of time was spent at our house the last few days. We are loving the progress.

There are a few mistakes our FM is addressing. They include: 
1. Re-building one area of the island because it wasn't long enough
2. Ordering the last porch column. Oops! 
3. Ordering new side splashes - they ordered the reversed side splash on accident
4. Ordering the lightrail molding in our kitchen
5. Fixing the main bath door
6. Removing and reinstalling the correct color of Shake siding

These seem like a lot, but building a house is complicated! This won't affect us much in the big picture, so we aren't stressing. Our site foreman seems like he's on top of the mistakes too, as he pointed some of them out to us. 

Today could be the day our fireplace stone is installed and our shake siding is fixed. I am not sure what else to expect so it will be my Christmas surprise when I get home! :) Happy Friday!  

Wednesday, December 18, 2013

Day 99 and Lookin' Fine

The carpenters showed up today and worked like animals, so coming home to my surprises today was MUCH BETTER than yesterday.
Before they left!! ((Loving our kitchen)) 

After they left! Love our counters... And our views! 

Crown - will still add light rail molding below

From the sunroom 


From the living area - we had no light

Den doors

Creepy pic from the foyer

From the dining room 

Master vanity

Trim cut in our primed bedroom

Main bath vanity with no filler strip we had a half hour phone call about with our temporary color girl

Eat ledge with a sharp corner... We wish we would have angled this for our kids' sakes. It is eye socket level. Ouch.


My island drawers and trash bins


Base molding started! 


Kids' closet doors not installed yet

So far, everything looks good. We have a few concerns with cabinets and my husband says he isn't so sure about how the end product was going to be due to some odd spots where things weren't flush or level.

They installed a hollow core door on our main bath, but we paid to upgrade the main bath door to solid wood due to wear and tear. This will be fixed.

Those are small things. It looks fantastic!

Can't wait for tomorrow. It will be our 100th day of the building process and I think the carpenters will be done! 














They started casing and jambing